2006 09 Kitchen Remodel |
2006 09 01 Cabinets in Progress 2006 09 07 Demolition, Problems 2006 09 14 Vent and Posts Move I 2006 09 19 Vent and Posts Move II 2006 09 25 Cabinets in Progress 2006 10 10 Cabinets in Progress 2006 10 16 Sheetrock, Lighting 2006 10 20 Paint, Cabinet Layout 2006 10 21 Cabinet Install Day 1 2006 10 22 Cabinet Install Day 2 2006 10 23 Cabinet Install Day 3 |
|
2006 10 21 Cabinet Install Day 1Today all the cabinetry arrived. It took only about 90 minutes for the driver and myself and the two installers to unload it all, even though it looked like a huge amount of stuff when the truck door was opened. It was all well packaged and wrapped and it looks like it all made it in good shape. Here are a few snaps of the array of "stuff" that we got. I'll never have to buy foam wrap again.. And here are a few shots of the cabinets going in. The sink wall cabinets went in first.. More of the same tomorrow.
|
||||||||||